2011 Fun Finder X X210WBS
Single Slide Fun Finder X Travel Trailer w/Rear Bath w/Lav., Toilet & Tub/Shower, Rear W/H & Storage, Jack-Knife Couch w/Table & Overheads/Shelf Slideout, Refrigerator, 3 Burner Range w/Microwave, Double Kitchen Sink, Front Lift-Up Queen Bed w/Wardrobes, Overhead Cabinet, Full Pass-Thru Storage in Front & Much More.
Single Slide Fun Finder X Travel Trailer w/Rear Bath w/Lav., Toilet & Tub/Shower, Rear W/H & Storage, Jack-Knife Couch w/Table & Overheads/Shelf Slideout, Refrigerator, 3 Burner Range w/Microwave, Double Kitchen Sink, Front Lift-Up Queen Bed w/Wardrobes, Overhead Cabinet, Full Pass-Thru Storage in Front & Much More.
Length
21 ft 9 in
Dry weight
3,370 lbs
Sleeps
5 people
Slideouts
1
Length
21 ft 9 in
Dry weight
3,370 lbs
Sleeps
5 people
Slideouts
1
As provided in the original listing
As provided in the original listing