2011 Cruiser RV Shadow Cruiser 195WBS

UsedTravel trailer|Stock #0029|Located at Razorback Camper Sales in Hot Springs, AR
$7,700$9,900
Save $2,200

Single Slide Shadow Cruiser by Cruiser RV w/Full Rear Bath Including Tub/Shower, Toilet, Sink, Large Wardrobe, TV Cabinet, Jack-knife Couch Slideout w/Table, Refrigerator, 3 Burner Range w/Oven, Dbl. Kitchen Sink, Front Queen Lift-Up Bed w/Wardrobes Both Sides, Overhead Cabinets Throughout, Front Exterior Storage Door w/Full Underbed Storage, and Much More! Available Options May Include: Microwave, A/C, Elec. Awning.

Specifications

Length

22 ft 3 in

Dry weight

3,369 lbs

Sleeps

4 people

Slideouts

1

Unit features & options

  • Flush Floor Total Control Slideout (280QBS, 260BHS, 20HS only)
  • 12V Above Floor Slideout (n/a 260BHS, 185FBR, 20HS, 19H, 16H)
  • Expresso, Peppercorn or Cherry Latte Decor
  • Urban Maple Cabinetry
  • Oil Rubbed Bronze Hardware
  • Fabric Box Valances
  • Pleated Night Shades
  • 5" High Density Cushions
  • Bedspread (n/a 20HS, 19H, 16H)
  • Handmade Medicine Cabinet
  • Directional Decorative Lights
  • Skylight and Fan in Bathroom
  • Laminated Countertops
  • Stainless Steel Sink with Gooseneck Faucet
  • Beau-Flor Cold Crack Resistant Flooring
  • Double Pocket Screwed Cabinets
  • Hinged 5" Bunk Mats (20HS, 19H, 16H only)
  • Bunk Fan/Light Combo (20HS, 19H, 16H only)
  • Zip Out Tent Windows (20HS, 19H, 16H only)
  • 12 Month Limited Warranty
  • Double Step Entrance
  • Aerodynamic Sweeping Front Profile
  • Powder-Coated Steel I-Beam Frame
  • Laminated, Crowned Aluminum Roof

Full specifications

Black Water Capacity38 gals
Cargo Capacity2556 lbs
Dry Weight3369 lbs
Ext Height9 ft 10 in
Ext Width7 ft 6 in
Fresh Water Capacity36 gals
Furnace BTU16000 btu
GVWR5925 lbs
Grey Water Capacity38 gals
Hitch Weight325 lbs
Int Height6 ft 4 in
Interior ColorPeppercorn, Cherry Latte, Espr
Length22 ft 3 in
Sleeps4
Slides1
Tire Size14"

Get more info

2011 Shadow Cruiser 195WBS

2011 Shadow Cruiser 195WBS
I'm interested in
Preferred contact method
EmailPhone callText message

We'll add you to our weekly newsletter too, but you can unsubscribe at anytime.