Skip to main contentSkip to navigation
RV Envy
RV floor plans
Inventory
Sell your RV
Dealers
Dashboard
  • Class A motorhomes
  • Class C motorhomes
  • Class B vans
  • Fifth wheel trailers
  • Travel trailers
  • Pop-up campers
  • Advanced search
  • Floor plan wizard
  • Inventory

Browse popular layouts & features

Class A motorhomes

  • … with bunk beds
  • … with two bedrooms
  • … with bath and a half
  • … with two full bathrooms
  • … with bunk over cab
  • … with rear bathroom
Browse all features →

Class B vans

  • … with King size bed
  • … with rear twin beds
  • … with Murphy bed
  • … with rear bathroom
  • … with dual twin beds
Browse all features →

Class C motorhomes

  • … with bunk over cab
  • … with bunk beds
  • … with rear bathroom
  • … with rear twin beds
  • … with Murphy bed
  • … with outdoor kitchen
  • … with outdoor TV
Browse all features →

Fifth wheel trailers

  • … with bath and a half
  • … with two bathrooms
  • … with bunk beds
  • … with two bedrooms
  • … with side patio
  • … with rear patio
  • … with outdoor kitchen
  • … with washer/dryer
  • … with front living
Browse all features →

Travel trailers

  • … with bunk beds
  • … with two bedrooms
  • … with Murphy bed
  • … with outdoor kitchen
  • … with rear bath
  • … with front bedroom
Browse all features →

Popup campers

  • under $10k
  • under $15k
  • under 2,000 lbs
  • under 3,000 lbs
Browse all features →

RV dealers by metro area

Los AngelesDallas–Fort WorthHoustonAtlantaPhoenixTampa BayOrlandoDenverChicagoSeattleNashvilleTorontoBrowse all metro areas →

Explore

  • RV floor plans
  • Browse inventory
  • Sell your RV
  • Dealers
  • Shopping tips

Company

  • About
  • Our story
  • Contact

Services

  • Dealer leads
  • Dealer websites & CRM
  • OEM advertising
  • Shopper insights

Join our mailing list

We don't send much, but you won't want to miss it!

RV Envy

The RV search engine. Find your dream RV.

We do our best to keep listing details accurate, but pricing, specifications, and availability come from third-party sources and can change without notice. We can't guarantee accuracy, so please confirm the details with the dealer before making any decisions. See something inaccurate? Contact us.

© 2026 RV Envy. All rights reserved.

For AI agentsPrivacyTerms
Dashboard
    1. Home
    2. Travel trailers
    3. Cruiser RV
    4. Shadow Cruiser
    5. 195WBS
    Cruiser RV Shadow Cruiser 195WBS exterior

    Cruiser RV Shadow Cruiser 195WBS

    Browse inventory (1)
    Cruiser RV Shadow Cruiser 195WBS floor plan
    Cruiser RV Shadow Cruiser 195WBS floor plan

    Key facts

    Length
    22 ft
    Sleeps
    2

    AI summary

    At just 22 feet and under 4,000 lbs, the 195WBS tows easily behind a wide range of vehicles without sacrificing the comforts you'd expect from something bigger. The 6' 9" vaulted ceiling alone makes the space feel roomier than the floorplan suggests. Inside, a Queen bed, double door refrigerator, and full bath handle the essentials, while touches like hardwood-framed cabinet doors, Shaw R2X carpet, and residential-style freestanding furniture give it a step-up feel for the price. The power awning with LED strip, LED-lit pass-thru storage, and exterior speakers with LED lighting make the outdoor living side just as functional. A built-in charging station with 12V and USB outlets is a small but well-placed detail that owners of this class genuinely appreciate.

    Owner reviews

    No owner reviews yet. If you've owned one, yours would be the first.

    Find a Cruiser RV Shadow Cruiser 195WBS

    See it in person or find a great deal nationwide.
    Browse inventory (1)

    Similar floor plans

    Other travel trailers floor plans (around 22 ft), similar in size and price to the Shadow Cruiser 195WBS.

    Travel Lite 775X 775X BASE exterior

    Travel Lite 775X 775X BASE

    MSRPTBD
    Travel Lite 775X 775X BASE floor plan
    Max weight

    1,722 lbs

    Length

    15 ft 1 in

    Sleeps

    2

    Forest River IBEX 10LHRK exterior

    Forest River IBEX 10LHRK

    MSRP$29,000

    3 units available

    Forest River IBEX 10LHRK floor plan
    Max weight

    3,790 lbs

    Length

    15 ft

    Sleeps

    2

    Forest River No Boundaries NB10.7 exterior

    Forest River No Boundaries NB10.7

    MSRPTBD

    5 units available

    Forest River No Boundaries NB10.7 floor plan
    Max weight

    3,725 lbs

    Length

    15 ft

    Sleeps

    2

    Forest River R-Pod Hood River Edition RP-107C exterior

    Forest River R-Pod Hood River Edition RP-107C

    MSRPTBD
    Forest River R-Pod Hood River Edition RP-107C floor plan
    Max weight

    3,715 lbs

    Length

    15 ft

    Sleeps

    2

    Forest River R-Pod RP-107C exterior

    Forest River R-Pod RP-107C

    MSRPTBD
    Forest River R-Pod RP-107C floor plan
    Max weight

    3,715 lbs

    Length

    15 ft

    Sleeps

    2

    Forest River IBEX 10RK exterior

    Forest River IBEX 10RK

    MSRPTBD

    1 unit available

    Forest River IBEX 10RK floor plan
    Max weight

    3,594 lbs

    Length

    15 ft

    Sleeps

    2

    Encore RV ROG 12BH exterior

    Encore RV ROG 12BH

    MSRP$26,338

    15 units available

    Encore RV ROG 12BH floor plan
    Max weight

    3,500 lbs

    Length

    15 ft

    Sleeps

    2

    Encore RV ROG 12RK exterior

    Encore RV ROG 12RK

    MSRP$25,250

    40 units available

    Encore RV ROG 12RK floor plan
    Max weight

    3,500 lbs

    Length

    15 ft

    Sleeps

    2

    Other Shadow Cruiser floor plans

    Cruiser RV Shadow Cruiser 16H

    MSRPTBD
    Cruiser RV Shadow Cruiser 16H floor plan
    Max weight

    3,700 lbs

    Length

    17 ft 6 in

    Sleeps

    2

    Cruiser RV Shadow Cruiser 180BHS

    MSRPTBD
    No floor plan photo
    Length

    22 ft 11 in

    Sleeps

    4

    Cruiser RV Shadow Cruiser 180MBS

    MSRP$40,087

    1 unit available

    Cruiser RV Shadow Cruiser 180MBS floor plan
    Max weight

    7,340 lbs

    Length

    22 ft 11 in

    Sleeps

    4

    Cruiser RV Shadow Cruiser 185FBR

    MSRPTBD
    Cruiser RV Shadow Cruiser 185FBR floor plan
    Max weight

    5,835 lbs

    Length

    18 ft 7 in

    Sleeps

    3

    Cruiser RV Shadow Cruiser 185FBS

    MSRPTBD

    1 unit available

    Cruiser RV Shadow Cruiser 185FBS floor plan
    Max weight

    5,810 lbs

    Length

    19 ft 3 in

    Sleeps

    3

    Cruiser RV Shadow Cruiser 193MBS

    MSRP$47,931

    5 units available

    Cruiser RV Shadow Cruiser 193MBS floor plan
    Max weight

    4,520 lbs

    Length

    22 ft

    Sleeps

    4

    Cruiser RV Shadow Cruiser 199RUD

    MSRPTBD
    Cruiser RV Shadow Cruiser 199RUD floor plan
    Max weight

    4,660 lbs

    Length

    23 ft 9 in

    Sleeps

    3

    Cruiser RV Shadow Cruiser 19H

    MSRPTBD
    Cruiser RV Shadow Cruiser 19H floor plan
    Max weight

    5,865 lbs

    Length

    20 ft 9 in

    Sleeps

    2

    Cruiser RV Shadow Cruiser 200RDS

    MSRPTBD

    1 unit available

    Cruiser RV Shadow Cruiser 200RDS floor plan
    Max weight

    4,800 lbs

    Length

    24 ft 3 in

    Sleeps

    3

    Cruiser RV Shadow Cruiser 20HS

    MSRPTBD
    Cruiser RV Shadow Cruiser 20HS floor plan
    Max weight

    5,860 lbs

    Length

    23 ft 9 in

    Sleeps

    4

    View all Shadow Cruiser floor plans →
    Cruiser RV Shadow Cruiser 195WBS overview
    Cruiser RV Shadow Cruiser 195WBS exterior

    Key facts

    Length
    22 ft
    Sleeps
    2

    Specs

    Dimensions

    Length
    22 ft
    Height
    10 ft 11 in
    Slideouts
    1
    Axles
    2

    Tanks & capacities

    Fresh water
    44 gal
    Gray water
    30 gal
    Black water
    30 gal

    Weight & towing

    Dry weight
    3,900 lbs
    Hitch weight
    540 lbs

    Accommodations

    Sleeps
    2

    Available years

    2018
    2017
    2016
    2015
    2014
    2013
    2010
    On this page...